| Turfdrain being installed on #13 fairway |
| Drainage installation #13 |
| Thank you to our friends at Jacobsen who have loaned us one of their new Trucksters to test. I must say that it is doing very well and helping us with our projects. |
| Finished stone wall at #18 red tee. |
| The start of the new stone wall on #7 tee. |
| All of the stone must be hand picked and then hauled to the intended location. |
| #7 red tee. |
| Main wall on #7 is finished as the staff start the secondary wall. |
| By adding a secondary wall at #7, we can better manage the steep slope with landscaping. |
| Digging a stump. |
| All of the stumps will be collected and hauled off to the dump. |
| New entrance to the maintenance facility. Additional landscaping will be added in the future. |
| The staff building additional covered storage. |
| Completed covered storage. |