Friday, March 1, 2013

#6 Drainage Project

  Being very productive is a great way to end the week.  Other than one day, we were able to work outside and complete a large portion of our drainage project on #6 fairway.  Since so many of you have emailed me that you like the pictures of our work, here are some pictures of #6 fairway taken this week.

Trenching drain lines on #6.
Cleaning the spoils from the trenches.
Adding sand into the trench.
View of #6
Notice the excess water.  This water is coming from in the ground and is the primary reason #6 stays so wet.  The new drainage system is designed to greatly reduce this problem.