Turfdrain being installed on #13 fairway |
Drainage installation #13 |
Thank you to our friends at Jacobsen who have loaned us one of their new Trucksters to test. I must say that it is doing very well and helping us with our projects. |
Finished stone wall at #18 red tee. |
The start of the new stone wall on #7 tee. |
All of the stone must be hand picked and then hauled to the intended location. |
#7 red tee. |
Main wall on #7 is finished as the staff start the secondary wall. |
By adding a secondary wall at #7, we can better manage the steep slope with landscaping. |
Digging a stump. |
All of the stumps will be collected and hauled off to the dump. |
New entrance to the maintenance facility. Additional landscaping will be added in the future. |
The staff building additional covered storage. |
Completed covered storage. |