We are well under way with the drainage project on hole #6. With the help of Micheal Smith of Syphon Systems we are quickly learning how to properly install the Turf Drain system. If the weather holds, I expect the project to take no longer than three weeks to finish.
 |
Putting together channel drains |
 |
It takes a lot of resources to install this type of drain system |
 |
Trenching #6 fairway |
 |
Digging a hole for a channel drain |
 |
Sod removal |